Foundation Works · Project 02

Turkish Embassy Solar Parkade Foundations

Turkish Embassy — concrete foundations for a solar parkade, completed by SSL.

Client
Turkish Embassy
Contractor
SSL
Scope
Solar Parkade Foundations
Location
Kampala, Uganda
Sector
Civil & Foundation Works
Completed
September 2026

SSL built the concrete foundations for a solar parkade (a solar car port) at the Turkish Embassy. Ten foundation columns were cast inside an existing interlocking-paver car park, using 14.5 m³ of concrete in total, ready to receive the galvanised steel solar structure.

The car park sits on a slope, so setting out and levelling was the critical task: every foundation had to be set to the right level relative to the others so that the steel structure stands true and the solar panels sit evenly. Levels were controlled from the setting-out stage, through excavation and formwork, to concreting, and the paving was reinstated around the finished foundations.

Scope of Work

Photo Gallery

Setting out: foundation positions marked on polystyrene boxes with steel stubs in the existing paved car park
Setting out: foundation positions marked on polystyrene boxes with steel stubs in the existing paved car park
Interlocking paving lifted and stacked beside each foundation strip, ready for excavation
Interlocking paving lifted and stacked beside each foundation strip, ready for excavation
The car park slopes across the site, so every foundation level had to be set relative to the others
The car park slopes across the site, so every foundation level had to be set relative to the others
Foundation trench excavated, with a reinforcement cage laid out beside it
Foundation trench excavated, with a reinforcement cage laid out beside it
Timber formwork erected around the foundation trench
Timber formwork erected around the foundation trench
Formwork complete: reinforced, lined and braced, ready for concrete
Formwork complete: reinforced, lined and braced, ready for concrete
Checking the formwork level against string lines before concreting
Checking the formwork level against string lines before concreting
Foundations cast flush with the surface while paving is reinstated around them
Foundations cast flush with the surface while paving is reinstated around them
Completed concrete foundations carrying the galvanised steel columns
Completed concrete foundations carrying the galvanised steel columns
Galvanised steel solar parkade structure erected on the finished foundations
Galvanised steel solar parkade structure erected on the finished foundations
10
Foundation Columns
14.5 m³
Concrete
Sep 2026
Completed