Road & Civil Works · Project 05

Nansana–Busunju Box Culvert & Solar Works

UNRA — delivered as subcontractor to China Wu Yi Co Ltd.

Client
UNRA
Main Contractor
China Wu Yi Co Ltd
Consultant
N/A
Location
Nansana – Busunju Corridor
Sector
Road & Civil Works
Reference
Project 05 of 10

This project combined box culvert construction with solar street lighting foundation works across four towns on the Nansana–Busunju corridor. SSL constructed triple cell box culverts and delivered 249 individual solar light foundations across Nansana, Wakiso, Kakiri, and Busunju.

Box Culvert Works

Stage 1: excavating the culvert pit
Stage 1: excavating the culvert pit
Stage 2: compacting the foundation bedding
Stage 2: compacting the foundation bedding
Stage 3: blinding concrete, reinforcement and formwork
Stage 3: blinding concrete, reinforcement and formwork
Stage 4: reinforcement cages for the three cells
Stage 4: reinforcement cages for the three cells
Stage 5: concreting the floor slab and wall starter bars
Stage 5: concreting the floor slab and wall starter bars
Stage 6: walls cast, roof slab reinforcement and formwork in place
Stage 6: walls cast, roof slab reinforcement and formwork in place
Stage 7: waterproofing membrane and gabion protection
Stage 7: waterproofing membrane and gabion protection
Stage 8: backfilling and compacting beside the culvert
Stage 8: backfilling and compacting beside the culvert
Stage 9: completed triple-cell box culvert
Stage 9: completed triple-cell box culvert

Solar Street Light Foundations

Foundation pit with formwork, anchor bolts and cable conduit
Foundation pit with formwork, anchor bolts and cable conduit
Formwork around the freshly cast foundation
Formwork around the freshly cast foundation
Foundation after casting, anchor bolts in place
Foundation after casting, anchor bolts in place
Foundation and pillars ready for pole installation
Foundation and pillars ready for pole installation
Crane lifting the pole, panel and luminaire into position
Crane lifting the pole, panel and luminaire into position
Pole bolted to its base plate between the concrete pillars
Pole bolted to its base plate between the concrete pillars
Completed solar street light
Completed solar street light
249
Solar Foundations
621M³
Concrete
88T
Reinforcement
982M²
Waterproofing
4
Towns Covered
Need a similar project?